Healthcare Architecture
Est. 2003
3.2MSQ FT

Clinical space delivered across 14 states

147

Healthcare facilities completed on schedule

22%

Avg reduction in patient transfer time

99.97%

Infection control compliance — post-occupancy audits

Empty trauma bay with overhead surgical lights off, morning light cutting across polished resin floors — the architecture waits

"Trauma Bay 3 — St. Agatha Regional Medical Center, Phoenix AZ.
Delivered 14 days ahead of schedule. First patient admitted 48 hours post-handoff."

Operating Theaters
Emergency Departments
ICU Expansions
Ambulatory Surgery Centers
Behavioral Health Facilities
Patient Ward Redesigns
Infection Control Design
HVAC-Precision Environments
Operating Theaters
Emergency Departments
ICU Expansions
Ambulatory Surgery Centers
Behavioral Health Facilities
Patient Ward Redesigns
Infection Control Design
HVAC-Precision Environments
Case Study 01
2021 — 2023

Vertical ICU Expansion
Without Stopping Surgery Below

Hargrove Community Hospital — Fort Worth, TX · 380,000 sq ft

The Constraint

A 1960s community hospital with load-bearing concrete shear walls that couldn't be relocated. Three active surgical suites on floors 2–4 operating at full capacity, 18 hours a day. The board had approved a 3-floor ICU addition — but zero tolerance for surgical downtime during a 24-month build.

The Intervention

We designed a cantilevered structural transfer system that threaded three new ICU floors above the existing shell using moment frames positioned outside the surgical envelope. Vibration isolation pads on every column base. Construction sequenced in 6-hour windows between procedure blocks, never once triggering the hospital's vibration alert threshold.

The Outcome

2×

Bed capacity — 48 to 96 ICU beds

4.1→2.3 min

Code-blue response time

0

Surgical procedures cancelled during build

Rebar grid framework during ICU floor construction showing structural steel trusses
Exposed ductwork and mechanical risers installed in ICU ceiling cavity
Completed ICU corridor with polished floors and nurse station sightlines
Newly completed ambulatory surgery center operating room with clean white walls and stainless surgical equipment

Air Exchange Rate

25×/hr

Exceeds ASHRAE 170 by 4× in all surgical zones

Verified post-occupancy
Meridian Health System — Columbus, OH
Case Study 02
2022 — 2024

Seven Campuses.
Three Counties. One Surgical Standard.

Meridian Health System — Columbus, OH · 1.1M sq ft total program

The Constraint

A healthcare COO inheriting seven facilities built across five decades — each with incompatible infection control protocols, different HVAC zoning standards, and nursing station layouts that forced staff to walk 340 additional feet per shift compared to a purpose-built facility. Patient outcomes varied by campus. That variance was unacceptable.

The Intervention

We designed a consolidated campus master plan that collapsed seven locations into three, each built around a shared surgical services core. Nurse station sightlines calculated to cover 100% of patient beds within a 90° field of view. Every corridor width sized for two-gurney passing clearance. Infection control surfaces specified to allow full sterilization in under four minutes.

The Outcome

7

Campuses consolidated into 3

31%

Reduction in avg patient travel distance

14 min

Saved per surgical prep cycle

$2.4M

Annual operational savings — Year 1

Direct Sales

Schedule a Facility Assessment

A senior architect will review your site conditions, program requirements, and clinical objectives — no commitment, no generalist intake call.

150K sq ft
5K2M+
PDF
Free Resource

Healthcare Planning Checklist

The 47-point pre-design checklist our architects use before committing a single line to schematic drawings. Covers:

  • Infection control zoning requirements by facility type
  • HVAC air exchange minimums — OR, ICU, ED, and general ward
  • Nurse station sightline calculations
  • Code compliance checklist: FGI 2022 + ASHRAE 170
  • Patient transfer path optimization framework

No sales calls. PDF delivered immediately. Unsubscribe anytime.

Ready to redesign patient outcomes? Assessments typically scheduled within 5 business days.